Application Details   Print
From :   M/s RMC Plant at Group Housing sec 79 by Bestech India ()
No :   3876647 Date :   10/02/2017 16:43:56
Sub :   Application For - CTO / both/HWM / new

Activity:
Forward   
Description
Please examine the case thoroughly as per policy of the Board and putup with definite reasoned recommendation within 03 days positively.
Activity:
Verification  
Description
Please verify the documents/ application/ office record of the case from Hard file of the case thoroughly and submit within 03 days positively.
Note By: Kuldeep Singh (Regional Officer)
Date Time: 14/02/2017 12:00:01 PM
Forwarded To: AEE 1

Activity:
Forward   
Description
The scn may be issued to unit as--1- - Not deposited consent fee (available on the web-site www.hspcb.gov.in) alongwith security , only deposited rs 1.0 online..---2-Not submitted copy of agreement made with registered recycler of board for disposal of used dg set oil & not complying the Hazzardous & other Waste (M&TM)Rules,2016,.---3-Not uploaded the undertaking regarding compliance of directions of HSPCB issued vide letter no HSPCB/2013/267-278 dt 24/1/13 regarding RMCs .--4-not filled all the columns of application.--5--The ca certificate uploaded is of total project and not of Ready mix concrete plant.
Note By: Shailender Arora (AEE 1)
Date Time: 14/02/2017 23:05:01 PM
Forwarded To: Regional Officer

Activity:
Forward   
Description
Activity:
Show Cause (Send To Industry)    |   Reminder    |       |      View SCN (both/HWM) For Refusal 
Description
Note By: Kuldeep Singh (Regional Officer)
Date Time: 15/02/2017 12:49:35 PM
Forwarded To: AEE 1

Activity:
Forward    View Document
Description
Dear Sir, With reference to the above mentioned subject, we are herewith submitting the point-wise reply to the queries raised on the online application for Consent to operate of the said RMC Plant. 1. Not deposited consent fee (available on the web-site www.hspcb.gov.in) along with security, only deposited rs 1.0 online. Reply: The Consent Fee for 3 years of Rs. 34,800/- (Rupees thirty four thousand and eight hundred only) vide Demand Draft No. 060106 dated 28.02.2017 is attached as Annexure-I. Also, Performance security of Rs. 75,000/- (Rupees seventy five thousand only) vide Demand Draft No. 060103 dated 28.02.2017 has been attached as Annexure-II. 2. Not submitted copy of Agreement made with registered recycler of board for disposal of used DG set oil & not complying the Hazardous & other waste (M&TM) Rules, 2016. Reply: The copy of Agreement made with registered recycler of board for disposal of used DG set oil is attached as Annexure-III. 3. Not uploaded the undertaking regarding compliance of directions of HSPCB issued vide letter no. HSPCB/2013/267-278 dt 24/1/13 regarding RMCs. Reply: The undertaking regarding compliance of directions of HSPCB issued vide letter no. HSPCB/2013/267-278 dt 24/1/13 regarding RMCs is herewith attached as Annexure-IV (a) and the photographs of the compliance done at site are attached as Annexure-IV (b). 4. Not filled all the columns of application. Reply: All the columns of application form have been filled and the complete application form is attached as Annexure-V. (Due to some technical error, Part (E) Additional Information is not reflecting there after editing the application form, so we have written by hand the complete additional information in application form). 5. The CA Certificate uploaded is of total project and not of Ready mix concrete plant. Reply: The CA Certificate of Ready mix concrete plant (RMC) is attached as Annexure-VI. In view of the above, we request you to kindly grant us Consent to operate for our above said RMC Plant. Regards, Rajesh Ravi
Note By: 17GUSO3875498 (Industry)
Date Time: 10/03/2017 16:12:54 PM
Forwarded To: AEE 1

Activity:
Forward   
Description
The scn may be issued to unit as--1- 1- Not uploaded Latest analysis reports for Air emissions ,Noise level of DG sets & ambient air quality report -
Note By: Shailender Arora (AEE 1)
Date Time: 11/03/2017 20:33:04 PM
Forwarded To: Regional Officer

Activity:
Forward   
Description
What about SCN, if already issued and compliance thereof?
Note By: Kuldeep Singh (Regional Officer)
Date Time: 20/03/2017 14:02:28 PM
Forwarded To: AEE 1

Activity:
Forward   
Description
The unit has submitted the reply of scn and applied online.Unit uploaded documents , but there are shortcomings.. the online scn may be issued for shortcomings in application as- 1- Not uploaded Latest analysis reports for Air emissions ,Noise level of DG sets & ambient air quality report -
Note By: Shailender Arora (AEE 1)
Date Time: 20/03/2017 21:34:38 PM
Forwarded To: Regional Officer

Activity:
Forward   
Description
What about compliance of SCN issued via hard copy?
Note By: Kuldeep Singh (Regional Officer)
Date Time: 01/04/2017 07:20:09 AM
Forwarded To: AEE 1

Activity:
Forward   
Description
The unit has submitted the reply of scn and applied online.Unit uploaded documents , but there are shortcomings.the closure orders against the unit received from head office not suspended till date. the online scn may be issued for shortcomings in application as- 1- Not uploaded Latest analysis reports for Air emissions ,Noise level of DG sets & ambient air quality report ---2-the closure orders against the unit received from head office not suspended till date. the documents attached.
Attached Letter:
Letter Attached By Officials
View Letter
Note By: Shailender Arora (AEE 1)
Date Time: 09/04/2017 19:38:34 PM
Forwarded To: Regional Officer

Activity:
Forward   
Description
Activity:
Show Cause (Send To Industry)    |   Reminder    |       |      View SCN (both/HWM) For Refusal 
Description
Note By: Kuldeep Singh (Regional Officer)
Date Time: 10/04/2017 16:59:04 PM
Forwarded To: AEE 1

Activity:
Forward    View Document
Description
Sir, With reference to the above mentioned subject, please find herewith the point wise reply to the queries raised on above mentioned online application of CTO: Query 1: Not uploaded latest Analysis reports of Air emissions, Noise level of DG Sets & Ambient Air quality Report. Reply: The latest Analysis Reports of Air emissions, Noise level of DG Sets & Ambient Air quality Report are attached as Annexure-I (a), Annexure-I(b) and Annexure-I(c). Owing to the above, we request you to kindly grant us CTO for our above mentioned RMC Plant. Thanking You, Regards, Rajesh Ravi
Note By: 17GUSO3875498 (Industry)
Date Time: 15/04/2017 10:23:00 AM
Forwarded To: AEE 1

Activity:
Forward   
Description
the scn may be issued to unit as-1-the closure orders not suspended by board till date.
Note By: Shailender Arora (AEE 1)
Date Time: 19/04/2017 12:23:35 PM
Forwarded To: Regional Officer

Activity:
Forward   
Description
The reply has been submitted by unit, check reply and process case accordingly. Ask unit for submitting request for suspension of closure orders so that the case could be decided.
Note By: Satinder Pal (Regional Officer)
Date Time: 24/04/2017 11:16:35 AM
Forwarded To: AEE 1

Activity:
Forward   
Description
The unit has submitted request for suspension of closure orders and same has been sent to Head office , which is pending at head office.
Note By: Shailender Arora (AEE 1)
Date Time: 25/04/2017 21:22:59 PM
Forwarded To: Regional Officer

Activity:
Forward   
Description
Pursue case with the branch incharge and send reminder if required.
Note By: Satinder Pal (Regional Officer)
Date Time: 26/04/2017 19:07:12 PM
Forwarded To: AEE 1

Activity:
Forward   
Description
The copy of request has already been sent to ho vide no 373-74 dt 17/4/17.copy attached.
Attached Letter:
Letter Attached By Officials
View Letter
Note By: Shailender Arora (AEE 1)
Date Time: 17/05/2017 18:50:04 PM
Forwarded To: Regional Officer

Activity:
Forward   
Description
Process case after suspension of closure orders. Send reminder in hard copy.
Note By: Satinder Pal (Regional Officer)
Date Time: 19/05/2017 16:30:06 PM
Forwarded To: AEE 1

Activity:
Forward   
Description
the reply of HO letter no HSPCB//SC-C/2017/722 DT 01.06.17 HAS BEEN SENT TO HO VIDE THIS OFFICE LETTER NO 3056 DT 13.06.17. (COPY ATTACHED).
Attached Letter:
Letter Attached By Officials
View Letter
Note By: Shailender Arora (AEE 1)
Date Time: 13/06/2017 17:39:07 PM
Forwarded To: Regional Officer

Activity:
Forward   
Description
Pursue case at HO level and put up case after getting suspension of the closure orders.
Note By: Satinder Pal (Regional Officer)
Date Time: 13/06/2017 17:48:49 PM
Forwarded To: AEE 1

Activity:
Forward   
Description
due to transfer
Note By: Shailender Arora (AEE 1)
Date Time: 19/07/2017 14:22:52 PM
Forwarded To: Regional Officer

Activity:
Forward   
Description
Process case and submit report.
Note By: Satinder Pal (Regional Officer)
Date Time: 21/07/2017 20:05:36 PM
Forwarded To: AEE 1

Activity:
Forward   
Description
The said unit is a Ready Mix Concrete Plant. The said RMC plant is dedicated only for Group Housing Project at village-Naurangpur, Sector -79, Gurugram & it was closed by Board being non applicant under Water (Prevention & Control of Pollution) Act, 1974 & Air (Prevention & Control of Pollution) Act, 1981. It was closed by sealing the plant & machinery on 13-04-2017 in compliance of head office letter No. HSPCB/2017/3566-68 dated 10-03-2017 & the compliance of closure order sent to Head Office vide this office letter no. 360 dated 13-04-2017. Unit applied for CTO online alongwith CTO fees. The unit submitted copy of Environment Clearance, copy of CTE & license of DTCP, Gurgaon. The said Readymix concrete plant has submitted their justification in this office regarding their establishment. As per the unit’s letter, the EC for the said project was granted on 12-12-2013 and the CTE was granted to the unit from the Board on 03-02-2014, but due to some unavoidable circumstance, the construction of the unit was started later. The unit has submitted the receiving of half yearly compliance reports of EC conditions in this office stating that their construction was not started till 28-12-2015, which shows that their operation of RMC plant was not started till 28-12-2015. The said unit is having Capital investment of Rs. 30 Lakhs and as per Head Office order no. HSPCB/2014/1804-22 dated 11-06-2014, the unit was exempted from getting CTE/CTO from the Board. The said unit has been now covered in Green category at Sr. No. 37 as per Head Office order No. HSPCB/PLG-135/2016/546-572 dated 14-07-2016 and order No. HSPCB/PLG-171/2017/4081-4106 dated 19-05-2017 (which is defined as Sr. No. 22 as RMC plant are covered under consent management irrespective of investment cost). As per the justification submitted by the unit , the unit has been established after 28-12-2015 and need not to obtain CTE/CTO from the Board till 19-05-2017. The unit has already applied for CTO online on OCMMS. Keeping in view of above facts, it is submitted that the closure order against the said Readymix Concrete Plant may be suspended as already proposed vide this office letter No. HSPCB/GRS/2017/373-74 dated 17-04-2017 so that the CTO case could be decided within time as per policy of the Board. The case is also sent to Head Office in Hard Copy (Copy of reply against Head Office letter No. HSPCB/Sc-C/2017/1331 dated 12-07-2017 is Attached)
Attached Letter:
Letter Attached By Officials
View Letter
Note By: Sachin Narwal (AEE 1)
Date Time: 24/08/2017 10:06:37 AM
Forwarded To: Regional Officer

Activity:
Forward   
Description
Send reminder to HO for suspension of closure orders in hard copy as the suspension case can't be processed online.
Note By: Satinder Pal (Regional Officer)
Date Time: 02/09/2017 12:15:19 PM
Forwarded To: AEE 1

Activity:
Forward   
Description
The unit had submitted request for suspension of closure orders and recommendation for the same has already been sent to Head Office in hard copy also. The CTO case is pending for a long time period before the Board as the request of the unit in this regard is not decided yet. So the case may be sent to competent authority and may be requested to advice whether the online CTO case should be refused or may be kept on hold till the decision of suspension of closure orders.
Note By: Sachin Narwal (AEE 1)
Date Time: 23/11/2017 12:03:45 PM
Forwarded To: Regional Officer

Activity:
Forward   
Description
As the unit is already closed therefore the CTO can't be granted to a closed unit . Put up case for N/A.
Note By: Satinder Pal (Regional Officer)
Date Time: 24/11/2017 14:02:41 PM
Forwarded To: AEE 1

Activity:
Forward   
Description
The unit was closed by the Board and in compliance of the closure orders, the unit had applied for CTO online and also submitted request for suspension of closure orders. The recommendation for the same has already been sent to Head Office in hard copy also. The CTO case is pending for a long time before the Board as the request of the unit in this regard is not decided yet. As the HEPC is monitoring and regulating the days for deciding any application but this application could not be decided till the decision of suspension of closure orders comes from competent authority. The case will be decided as and when the decision received in this regard. So the case may be sent to nodal officer of HEPC and may be requested to freeze the application until the decision on suspension of closure orders comes from competent authority.
Note By: Sachin Narwal (AEE 1)
Date Time: 29/11/2017 13:50:04 PM
Forwarded To: Regional Officer

Activity:
Forward   
Description
In view of the facts mentioned by the field officer the case is forwarded to nodal officer of HEPC and it is requested to freeze the application until the decision on suspension of closure orders received from competent authority to avoid unnecessary pendency on the part of board.
Note By: Satinder Pal (Regional Officer)
Date Time: 29/11/2017 15:26:22 PM
Forwarded To: AEE HEPC

Activity:
Forward   
Description
As requested by the RO, application may be freezed.
Note By: Nipun Gupta (AEE HEPC)
Date Time: 30/11/2017 11:45:59 AM
Forwarded To: EE HEPC

Activity:
Forward   
Activity:
Application frozen
Description
Approved for freeze,as proposed by AEE HEPC.
Note By: Balraj Singh (EE HEPC)
Date Time: 30/11/2017 17:09:59 PM
Forwarded To: AEE HEPC

Activity:
Forward   
Description
Note By: Nipun Gupta (AEE HEPC)
Date Time: 01/12/2017 09:38:51 AM
Forwarded To: Regional Officer

Activity:
Forward   
Description
For N/A.
Note By: Satinder Pal (Regional Officer)
Date Time: 01/12/2017 12:09:04 PM
Forwarded To: AEE 1

Activity:
Forward   
Description
The said unit is a Ready Mix Concrete Plant and falls under green category. Earlier vide Board order No-HSPCB/2014/1804-22 dated 11-06-2014, RMC plants having investment cost less than 1 crore were exempted from consent management and in the new notification dt 14-07-2016 and further clarification dated 19.05.2017, RMC plants are now covered under green category of units. The above said RMC plant is dedicated only for Group Housing Project at village-Naurangpur, Sector -79, Gurugram & it was closed by the Board due to non applicant vide Board order No. HSPCB/2017/3566-68 dated 10-03-2017 and after applying CTO alongwith required documents and required consent fees, the case of suspension of closure orders was sent to the Head Office through Hard copy vide this office letter No. HSPCB/GRS/2017/373-74 dated 17-04-2017 and same is pending in Head Office due to policy decision to be decided by TAC. Now as per the discussions with Dr. S.K.Rohilla, Scientist C, HQ, HSPCB, TAC has given its opinion that in these type of cases, closure orders can be suspended without initiating prosecution action against these units. In view of above it is again recommended that closure orders issued by the Board may be suspended with the following conditions : 1. The unit will submit A/R of Effluent/Air emissions/Noise, as applicable within 20 days from the date of issue of suspension of closure orders. It is also requested that the application may also be defreezed so that CTO application could be decided.
Attached Letter:
Letter Attached By Officials
View Letter
Note By: Sachin Narwal (AEE 1)
Date Time: 02/02/2018 11:48:42 AM
Forwarded To: Regional Officer

Activity:
Forward   
Description
Put up case after discussion with Sc B in context to the case submitted in hard copy for suspension of closure orders.
Note By: Satinder Pal (Regional Officer)
Date Time: 13/02/2018 12:27:08 PM
Forwarded To: AEE 1

Activity:
Forward   
Description
As per the discussions held with Dr. S.K Rohilla, Sc-C telephonically on 17-02-2018, the closure orders of RMCs has been suspended and the CTO may be granted to the units. So in view of this the approval for de-freezing may be got accorded from the Competent Authority and application may be defreezed in OCMMS.
Note By: Sachin Narwal (AEE 1)
Date Time: 17/02/2018 12:11:44 PM
Forwarded To: Regional Officer

Activity:
Forward   
Description
The approval for de-freezing may be got accorded from the Competent Authority and application may be defreezed in OCMMS please.
Note By: Satinder Pal (Regional Officer)
Date Time: 17/02/2018 12:41:33 PM
Forwarded To: Scientist C

Activity:
Forward   
Description
Case submitted for de-freezing the application as recommended by RO.
Note By: S K Rohilla (Scientist C)
Date Time: 17/02/2018 15:12:26 PM
Forwarded To: MS

Activity:
Forward   
Description
May approve de freezing of application, as proposed
Note By: S Narayanan IFS (MS)
Date Time: 18/02/2018 08:22:19 AM
Forwarded To: Chairman

Activity:
Forward   
Activity:
Application Unfrozen
Description
Note By: Ashok kheterpal (Chairman)
Date Time: 18/02/2018 10:33:04 AM
Forwarded To: MS

Activity:
Forward   
Description
For further necessary action please
Note By: S Narayanan IFS (MS)
Date Time: 18/02/2018 11:57:57 AM
Forwarded To: Scientist C

Activity:
Forward   
Description
Note By: S K Rohilla (Scientist C)
Date Time: 18/02/2018 14:00:43 PM
Forwarded To: Regional Officer

Activity:
Forward   
Description
Process case immediately.
Note By: Satinder Pal (Regional Officer)
Date Time: 18/02/2018 14:02:59 PM
Forwarded To: AEE 1

Activity:
Forward   
Description
RO level case………..The said unit has applied for CTO after covering under consent management being investment cost of less than 1 crore. The said RMC plant is dedicated only for Group Housing Project at village-Naurangpur, Sector -79, Gurugram & it was closed by Board being non applicant under Water (Prevention & Control of Pollution) Act, 1974 & Air (Prevention & Control of Pollution) Act, 1981. It was closed by sealing the plant & machinery on 13-04-2017 in compliance of head office letter No. HSPCB/2017/3566-68 dated 10-03-2017 & the compliance of closure order sent to Head Office vide this office letter no. 360 dated 13-04-2017. Unit applied for CTO online alongwith CTO fees. The case of suspension of closure orders was sent to the Head Office through Hard copy vide this office letter No. HSPCB/GRS/2017/373-74 dated 17-04-2017 and now as per the directions of Head office and discussions with Dr. S.K.Rohilla, Scientist C, HQ, HSPCB, TAC has given its opinion that in these type of cases, closure orders can be suspended without initiating prosecution action against these units and the closure orders has been suspended and the letter will be issued shortly. In view of above it is recommended that CTO may be issued to the unit from 18.02.2018 to 31.12.2020 with the following conditions : 1. The unit will submit A/R of Effluent/Air emissions/Noise, as applicable within 30 days from the date of issue of suspension of closure orders. 2. The unit will run and maintain its APCM regularly and properly & will keep all the parameters within limit. 3. The unit will comply with provision of all applicable Acts/Rules/Direction of the Board.4. Unit will get prior permission from the board before installing any polluting process in the unit. 5. The unit will comly the conditions of suspension of closure orders, whenever orders will be issued. 6. The unit will install and operate the pollution control measures as per the guidelines of RMCs dt 24.12.13 and comply with the directions issued time to time for the RMCs.
Activity:
Verification Closed    | View Verification Report   |
Description
Note By: Sachin Narwal (AEE 1)
Date Time: 18/02/2018 17:29:23 PM
Forwarded To: Regional Officer

Activity:
Forward   
Approval/Refusal Status:
Approved
Description
Note By: Satinder Pal (Regional Officer)
Date Time: 18/02/2018 18:12:54 PM
Forwarded To: Regional Officer

Activity:
Forward   
Description
Note By: Satinder Pal (Regional Officer)
Date Time: 18/02/2018 18:30:50 PM
Forwarded To: Regional Officer

Activity:
Forward   
Description
Note By: Satinder Pal (Regional Officer)
Date Time: 18/02/2018 18:33:29 PM
Forwarded To: Regional Officer

Activity:
Forward   
Description
CTO & Authorization issued.
Activity:
Close After Approval
Description
CTO & Authorization issued.
Note By: Satinder Pal (Regional Officer)
Date Time: 19/02/2018 08:34:40 AM
Forwarded To: Regional Officer